Vial Filling‑Labeling Solution Achieves Commercial Production in Six Weeks in Indonesia

Vial Filling‑Labeling Solution Achieves Commercial Production in Six Weeks in Indonesia

 

 vial filling machine line

Growing market demand pushes drug and liquid-product makers to upgrade old production lines. This real project shows how we delivered a combined vial filling machine and labeling machine solution for a maker in Indonesia. The customer wanted to replace slow old equipment, raise output, and get stable label results on finished products. This article covers the project background, the customer’s problems, the custom setup, the on-site work, the production results, and the customer’s own comments.


Project Basic Information

Item

Details

Customer Country

Indonesia

Factory City

Tangerang

Main Equipment

1 set vial filling machine, 1 set labeling machine

Trade Term

FOB Shanghai, sea freight shipment

Total Project Value

USD 24,008

Shipping Port

Shanghai, China

Destination Port

Jakarta, Indonesia

Application

Liquid vial filling and automatic container labeling


Customer Demand & Pain Points

The customer’s old line had several problems that limited business growth.

1. The old line had low output: the old semi-manual filling setup could not keep up with rising orders, and its capacity could not meet growing market demand, so backlogs formed.
2. The old line depended heavily on manual work: operators spent much time labeling vials by hand, and this work led to uneven label position, wrinkles, and a high reject rate.
3. The old line had a broken process: filling and labeling ran as separate steps, so extra workers moved vials between stations, and this raised contamination risk and total cycle time.
4. The customer needed a small ready-to-run solution: the workshop had little space, so the customer needed an integrated and easy-to-maintain vial filling machine plus a matching labeling machine, and the customer did not want large factory rebuilding.

Buyers in similar industries look for solutions to low output, uneven label quality, high labour cost, and disconnected filling and labeling steps.

wrapped vial filling machine


Our Custom Solution

Our engineering team looked at the factory space limits and production targets, and the team recommended a matched two-unit package.

The vial filling machine is a precision liquid filling unit built for stable continuous vial processing; it has stainless-steel parts that touch liquid, it is easy to take apart for cleaning, and it uses sensor-driven “no-vial-no-fill” protection to cut material waste. Its small footprint fits the customer’s existing workshop layout.

The labeling machine is a fully automatic inline labeler matched to the filling machine’s output speed; it labels round vial surfaces, gives steady label placement, and reduces manual labour.

We improved the conveyor interface settings so filled vials move smoothly from the filling machine outlet into the labeling machine inlet, and the two machines form a small connected workflow without major civil-work changes.

The project scope includes a full set of operation manuals, maintenance guides, a spare-parts kit, and a remote technical support package.


On-site Installation

The project moved from factory dispatch to commercial production in about six weeks, and the timeline below summarizes the work.

Day 1–7: We completed production final inspection, packing, and container loading at our China factory, and the goods left Shanghai port by sea toward Jakarta.

Day 28–32: The ocean cargo arrived at Jakarta port, the customer completed local customs clearance, and the customer moved the machine packages to the Tangerang production facility.

Day 33–36: The local team unpacked, positioned, and mechanically assembled the vial filling machine and labeling machine, and local technicians connected power and air supply under our remote guidance.

Day 37–40: We completed commissioning; the team ran no-load tests first, then trial runs with customer sample vials, and we fine-tuned filling volume parameters and labeling position offsets.

Day 41–43: We trained operators on daily startup and shutdown, parameter adjustment, routine cleaning, fault alarm identification, and basic troubleshooting for both machines.

Day 44: We ran the final acceptance test with a full simulated production batch; the equipment passed all performance checks, and the new line entered formal commercial production.

Pack the labeling machine into boxes


Production Effect

Comparison Item

Old Production Line

New Line (vial filling machine + labeling machine)

Filling mode

Semi-manual filling

Automatic continuous filling

Labeling operation

Full manual labeling

Inline automatic labeling

Labour per shift

4 operators

2 operators

Label defect rate

8–11%

Below 1.5%

Material waste rate

High due to manual operation

Greatly reduced by sensor protection

Workflow connection

Separate filling and labeling stations

Smooth inline transfer between two machines

The business impact is lower labour need, fewer rejected products, a shorter total production cycle, and better appearance consistency of finished products.


Customer Feedback

Three team members from the customer plant shared what they saw after the upgrade.

Production Supervisor: "Before this upgrade, we struggled with slow output and messy manual labeling results. The vial filling machine runs stably day to day, and the labeling machine keeps labels neat on every vial. Our reject numbers dropped significantly, and the training materials are clear enough for our team to learn quickly."

Quality Control Manager: "Product uniformity improved after switching to the new set. Filling volume stays consistent batch to batch, which helps our QC team reduce repeated inspection work on filled and labelled vials. We are satisfied with the machine build quality."

Plant Operations Manager: "We chose the combined filling and labeling solution for space-saving reasons. Remote technical support responded quickly during commissioning. This equipment helps us catch up with increased market orders, and we would consider cooperation again for future capacity expansion."

vial filling machine closeup


Get Quotation for Similar-Scale Production Lines

Is your production line troubled by low output, high manual labour cost, unstable label quality, or a high product reject rate?

We supply tailored vial filling machine and matching labeling machine solutions based on your actual hourly output target, vial size range, and workshop environment.

Our machine strengths:

• The machine uses stainless-steel construction that meets general pharmaceutical production requirements.
• The machine has a modular design, so it is easy to clean and maintain.
• The machine has adjustable parameters, so it fits multiple vial sizes.
• The package includes complete documents, operator training guidance, and long-term spare parts support.
• The machine offers flexible configuration for small-to-medium batch manufacturing.
You can send your production requirements to sales@micmedicalmachine.com, and we will send you a customized quotation.


FAQ

 

1. Can the vial filling machine adapt to different vial sizes?

Yes, our vial filling machine supports size change-over when you swap filling nozzles and guide parts. The operation manuals include detailed change-over instructions. You should provide your vial dimension information when you request a quote.

2. Does the labeling machine work together with the vial filling machine out of the box?

For matched orders, we adjust conveyor speed and transfer interface parameters before shipment, so the two machines can connect inline. The team needs minor fine-tuning during on-site commissioning based on real vial samples.

3. What kind of after-sales support can we receive after shipment?

We provide operation manuals, video guides, remote online troubleshooting, and spare-parts supply. We can arrange on-site service after separate negotiation when you need it.

4. What liquid types are suitable for this vial filling machine?

The machine fits most low-to-medium-viscosity liquid products for vial packaging. If your liquid has special viscosity, corrosive properties, or particles, you should notify our sales team for evaluation.

5. How long is the typical lead time for a vial filling machine plus a labeling machine set?

A standard configuration usually takes 30–45 working days for manufacturing and pre-shipment testing. Lead time will change if you need custom modification.